Domostroy handles the entire build in Cyprus: design, permits, all construction and finishing work. You deal with one company that owns the result — no finger-pointing between contractors.
The price is fixed in the contract before work begins. You know your final cost and timeline up front.
We discuss your plot, wishes, budget and timeline.
We prepare the design and a fixed estimate that goes into the contract.
We obtain all the building permits required in Cyprus.
We build in stages with reporting and quality control.
Interior and exterior finishing to your chosen specification.
We hand over the finished home with full documentation.
Before construction can begin, Cyprus law requires two separate permits. We handle the entire process for you.
Construction in Cyprus is governed by two consecutive permits. First comes the Town Planning Permit, which confirms that the project complies with zoning, the local development plan, permitted density and building height, and boundary setbacks.
Next comes the Building Permit, which confirms that the technical design meets the standards for structural elements, fire safety, energy efficiency and sanitation.
Since mid-2024, all applications are submitted online through the government's IPPODAMOS system. Applications are filed by an ETEK-registered architect or engineer — that's us and our design team.
Every project in Cyprus is checked against building regulations. We comply with them from the very first design stage.
Design and calculation of structures for strength and stability, including Cyprus seismic requirements.
Compliance with requirements for fire resistance, escape routes and fire-protection solutions.
The design meets energy-performance standards — a mandatory requirement for new construction.
Water supply, sewerage, drainage and sanitary standards to Cyprus regulations.
At every key stage of the build we run our own quality control: we check that the work matches the approved design, along with the materials and methods used. You receive progress reports and always know what stage your home is at.
On completion, a Certificate of Final Approval is issued. This is a key document: without it the home cannot legally be occupied or sold, or connected to the electricity grid.
We see the project through to this certificate — you receive a home fully ready for registration and living.
By law from 20 days, but in practice each of the two permits takes 1.5 to 3 months. The final timeline depends on the project type, the plot and the authorities' workload; we'll give you an accurate estimate for your plot at the consultation.
No. All applications through IPPODAMOS are filed by our ETEK-registered specialist. Correspondence with the authorities is in Greek — we handle it entirely.
Foreign nationals can build and own property in Cyprus. Separate rules apply to land purchases by foreigners — there's a limit of one property per person, but purchase permits are granted in practically all cases. We'll advise you at the consultation and help you through the procedures.
Yes. The cost is locked into the contract before work begins. You know the final price and timeline in advance, with no surprise surcharges during the build. If you request additional work or scope, it's paid separately — and this is set out in the contract in advance.